The '32 Gets a New Floor

Image

The next step of our '32 build is the floor. We first cut a cardboard template for both the floor and the toe board and set each into place for a final fit. We then traced around our cardboard template onto a sheet of 3/4 inch plywood and cut each out with a jig saw.

FloorPattern

Before cutting the plywood floor a cardboard template was made for both the floor and toe board. The template was then set into the body and checked for proper fit.

FloorFabrication

Both the Toe Board and the Floor Board templates have been traced onto 3/4 inch plywood and cutout with a jig saw.

FloorInstallation

Checking the final fit of the 3/4" Plywood Floor and making any needed adjustments.