Body to Frame and Final Assembly
Final preparation complete and ready for body drop onto frame
Body has been bolted and shimmed to the frame and seat and windshield installed
The inside of the body has had Dynamat applied for sound deadening
Cutting the floor and toe board from 3/4 inch plywood
Ready for the floor to be installed
Floor installed along with a custom transmission tunnel needed to cover the T5 transmission
The trunk area is framed out with wood to support the side panels and carpet
Sanding and buffing the paint
Wire harness being installed
Carpet, shift boot and emergency boot installed
Seat, door and kick panels, as well as dash and gauges, installed
Upholstered and carpeted trunk
Convertible top frame assembly in place and canvas top being installed
The roadster leaving the office for the first time to go for a custom exhaust system
Custom exhaust being installed