Final Frame assembly
After the POR-15 Rust Preventive Coating dried we reassembled to suspension, mounted the engine and transmission and completed any remaining issues with the frame build.
Front suspension installed.
Rear suspension installed.
Test fitting front Race Star wheel for clearance
Setting up relocated emergency brake cables.
Rolling frame complete and waiting for its trip to SEMA '19.
In place and all strapped down.
Loaded and off to SEMA.